Hello,
Sorry for late response.
A Control() command requires a subsequent two-byte subcommand.
There are example in Using I2C Communications With the bq34110 bq35100 and bq34z100-G1 Series of Gas about how to use Control() with Control Subcommands. (2.3…
Part Number: TDA4VEN-Q1
1. When sbl is started and the kernel loads c7x's/usr/lib/firmware using remoteproc, c7x may get stuck in the MRR register during the IPC initialization process
2. When starting the kernel with spl and using remote proc to…
Thank you for your reply. The screenshot below shows the key parameters in the schematic I am using, along with the corresponding design calculation results.
Item A32 in the calculation table should be 420 V, but I am unable to edit this value in the…
Other Parts Discussed in Thread: TIDM-BUCKBOOST-BIDIR , TIDM-DC-DC-BUCK 请注意,本文内容源自机器翻译,可能存在语法或其它翻译错误,仅供参考。如需获取准确内容,请参阅链接中的英语原文或自行翻译。 https://e2e.ti.com/support/microcontrollers/c2000-microcontrollers-group/c2000/f/c2000-microcontrollers-forum/1538507/tidm…