This thread has been locked.
If you have a related question, please click the "Ask a related question" button in the top right corner. The newly created question will be automatically linked to this question.
We use DS90UH984 to drive a display with 1 port eDP interface. (SER IS 983);
During ESD test, the T-con will reset itself when detecting a error, and then send a HPD interrupt to 984,
I want to know, Does 984 can monitor the HPD signal and rebuild the eDP connection all the time during normal display?
Thanks.
Hello I think the soft reset should re-initiate link training with the screen.
I would confirm this question again, and would reply you as soon as possible.
984 does not automatically link-train upon HPD request after the initial video bringup script has been run. It will require manual SW intervention to reset 984 if link training is lost.
No problem。
If you have any other questions, please contact again, and I would close this post.