1 What is the distance when the reference design reaches 30um--40um accuracy?
2 From the capture to the point cloud calculation out , it need 4.8s, if the deletion of "patern sorting" and only quickly calculate the rectangle long, wide, high, whether the opportunity to do within 1s?
3 The first phase of the current run in the CPU, the performance can not meet the needs of the factory, when is the second stage (DSP) to be completed?